Closing the gap between strategic and tactical mine planning

Strategic mine plans are commonly developed to maximise project value; however, operational constraints often emerge as plans progress toward execution. This can create a disconnect between long-term planning assumptions and achievable operational outcomes. At Detour Lake Mine, an operational gap assessment was undertaken to evaluate phase interaction, vertical advance rates, phase minimum mining width, truck congestion, shovel area, haulage access and geotechnical constraints. The assessment was conducted jointly by strategic planning, mine operations and shortterm planning teams and was used to test the practicality of existing phase designs and mining sequences. Results identified opportunities to simplify the mine layout, improve mining widths, reduce equipment congestion and enhance operational flexibility. The assessment framework was subsequently incorporated into mine design and scheduling decisions, reducing the number of mining phases from eight to six and improving access to ore. The work demonstrates how integrating operational considerations into strategic planning can improve mine plan robustness, executability and long-term value realisation.
Return to parent product
  • Closing the gap between strategic and tactical mine planning
    PDF
    This product is exclusive to Digital library subscription
  • Closing the gap between strategic and tactical mine planning
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2026
  • Pages: 4
  • PDF Size: 0.369 Mb.
  • Unique ID: P-05734-M6N8F2

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.