Conference Proceedings
Strategic Mine Planning Conference Proceeding 2026
Conference Proceedings
Strategic Mine Planning Conference Proceeding 2026
Commodity prices have increased significantly in the last two years – have you adjusted your Life Of Asset (LOA) plan yet? Have you adjusted it in the right way?
Commodity prices (especially gold but also copper and others) have increased dramatically in the last two years – beyond levels mining companies ever contemplated in their previous sensitivity analysis. If mining companies did nothing other than keep operating the same Life Of Asset (LOA) plan as they had before, they would clearly be making a lot more money at the higher metal prices – they could not help but do so. Presumably, if a mining company were to update their LOA plans for the new metal prices, they could do even better. Or not!! It all depends on how you do you LOA planning, and which optimisation mechanisms you do or do not apply. By anecdotal observation (having read hundreds of technical reports) it appears about 80 per cent of the mines worldwide apply what we would call ‘basic’ mine-planning. They optimise the pit, phases and mine-schedule. They use the break-even (marginal) cut-off to decide what material goes to the plant versus the waste dump, with either no stockpiling or just enough stockpiling to balance ore mined to ore processed across the years. Processing calibration and product specifications are fixed. What happens to the elements of a LOA plan with this style of planning if the metal price goes up?
Contributor(s):
G Whittle
-
SubscribeCommodity prices have increased significantly in the last two years – have you adjusted your Life Of Asset (LOA) plan yet? Have you adjusted it in the right way?PDFThis product is exclusive to Digital library subscription
-
Add to cartCommodity prices have increased significantly in the last two years – have you adjusted your Life Of Asset (LOA) plan yet? Have you adjusted it in the right way?PDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2026
- Pages: 2
- PDF Size: 0.102 Mb.
- Unique ID: P-05689-V1H4Y7