Skip to main content
Conference Proceedings

Strategic Mine Planning Conference Proceeding 2026

Conference Proceedings

Strategic Mine Planning Conference Proceeding 2026

PDF Add to cart

Cut-off grade as a variable – an emergent property of multi-constraint mine plan optimisation at Evolution Mining’s Red Lake operations

In the 18 months preceding Evolution Mining’s (EVNs) FY27 Life-of-Mine (LOM) planning cycle, the Long Term Planning (LTP) team completed a comprehensive Strategic Optimisation process for Red Lake Operations (RLO) in Ontario, Canada. The process evaluated a broad range of strategic alternatives, including ore source selection, capital investment opportunities, processing infrastructure configurations, and development sequencing strategies, with the objective of identifying value-accretive pathways for the operation. The Strategic Optimisation process included the ability to optimise and trade-off alternative inventory selections, including cut-off grade by orebody. To validate the inventory options selected in the study and translate them into detailed mine plan scenarios, EVN developed and implemented a Variable Cut-off Grade (vCOG) optimisation methodology using the Deswik® APEX (APEX) platform as part of the FY27 LOM optimisation process. Unlike conventional planning workflows, where cut-off grade is treated as a fixed planning input, the vCOG methodology allows multiple inventory alternatives to be presented to the optimiser for each stope location. The optimiser then selects the inventory option that maximises value within the context of the broader mining system, simultaneously considering schedule timing, operating constraints, capital decisions, and competing opportunities across the operation. The optimisation was applied across 26 underground block models and approximately 80 000 scheduling activities. More than 60 scenario combinations were evaluated to test the sensitivity of project value to key operational and strategic assumptions. The resulting optimisation outputs provided validation of the preferred strategic direction, generated orebody-level planning guidance, and delivered insight into the relative importance of major operational and capital constraints. This work demonstrates a practical framework for integrating cut-off grade determination within the scheduling process and highlights how modern optimisation tools can be used to strengthen the link between strategic mine planning, inventory selection, and Life-of-Mine plan development.
Return to parent product
  • Cut-off grade as a variable – an emergent property of multi-constraint mine plan optimisation at Evolution Mining’s Red Lake operations
    PDF
    This product is exclusive to Digital library subscription
  • Cut-off grade as a variable – an emergent property of multi-constraint mine plan optimisation at Evolution Mining’s Red Lake operations
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2026
  • Pages: 14
  • PDF Size: 0.397 Mb.
  • Unique ID: P-05706-K4G2H6

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.