Conference Proceedings
Strategic Mine Planning Conference Proceeding 2026
Conference Proceedings
Strategic Mine Planning Conference Proceeding 2026
Debottlenecking underground stoping operations using an integrated Mine to Mill-to-backfill digital twin and optimisation model
Underground stoping operations are governed by tightly coupled constraints across mining, material handling, processing, tailings management and backfilling. Bottlenecks can emerge from interactions between mobile equipment capacity, ventilation availability, working-face temperature, haulage and hoisting limits, processing throughput, tailings handling and paste backfill readiness. These interactions evolve over time and are difficult to quantify using conventional long-term planning tools, which can result in schedules that appear feasible but underperform during execution. This paper presents an integrated, Newmont-developed Mine to Mill-to-backfill digital twin and strategic optimisation workflow for an operating underground longhole open stoping mine. The digital twin is calibrated using historical operating data and validated by replaying a historical plan, achieving simulated P50 delivery within 10 per cent of actual outcomes. Bottleneck insights from the digital twin are translated into explicit constraints in a strategic optimisation model that generates rapid life-of-mine schedules at quarterly scale. In the case study, the optimised schedule delivered an improvement up to 10 per cent in discounted cash flow relative to the base schedule. The quarterly strategic plan is then passed through a constraint programming based resource allocation model that preserves the annual strategic targets while adjusting the timing and sequence of tasks within each year to reflect resource availability and operational constraints. The resulting plan is then decomposed into shift based tasks and re tested in the digital twin. This final simulation step confirms whether the improvement in discounted cash flow remains achievable under realistic variability, resource constraints and system interactions.
Contributor(s):
A Kumar, R Goodfellow, K Dempster
-
SubscribeDebottlenecking underground stoping operations using an integrated Mine to Mill-to-backfill digital twin and optimisation modelPDFThis product is exclusive to Digital library subscription
-
Add to cartDebottlenecking underground stoping operations using an integrated Mine to Mill-to-backfill digital twin and optimisation modelPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2026
- Pages: 4
- PDF Size: 0.334 Mb.
- Unique ID: P-05717-B5Q5D2