Conference Proceedings
Strategic Mine Planning Conference Proceeding 2026
Conference Proceedings
Strategic Mine Planning Conference Proceeding 2026
Digital solutions for sustainable mining – an optimisation methodology for pit-limit and extraction-sequence definition to reduce mining impacts and closure liabilities
Over the past two decades, mining legislation and societal expectations of the industry have changed substantially. The industry has responded with a stronger focus on environmental stewardship, community expectations and transparency. Industry-standard mine planning workflows have evolved to reflect these requirements but continue to rely heavily on manual iterations because of limitations in available digital solutions. These iterations typically occur during mine design and production scheduling, where multiple pit and pushback designs, extraction sequences, ex-pit dumps and pitvoid backfill options must be assessed to understand the range and sensitivity of mining impacts and closure requirements. This paper presents a reduced impact mining (RIM) digital solution that combines direct block scheduling (DBS) and phase/bench scheduling (PBS) to consider land disturbance and closure commitments while defining pit limits and internal extraction sequences. The methodology combines block models with environmental, heritage, hydrogeological and closure attributes and applies modified material-flow networks to represent waste-rock placement relative to the water table within released pit-void capacity. Minimum, maximum and ratio constraints prevent waste-rock allocation to backfill until sufficient pit-floor area is exposed. Ground-disturbance, rehabilitation and closure-activity triggers, constraints and costs are linked to the optimisation objective. The resulting DBS schedules guide initial pit-stage and backfill geometry for PBS, where operational constraints are introduced and the practical schedules are reconciled with the strategic DBS outcomes.
Contributor(s):
F Egger, L Fouché
-
SubscribeDigital solutions for sustainable mining – an optimisation methodology for pit-limit and extraction-sequence definition to reduce mining impacts and closure liabilitiesPDFThis product is exclusive to Digital library subscription
-
Add to cartDigital solutions for sustainable mining – an optimisation methodology for pit-limit and extraction-sequence definition to reduce mining impacts and closure liabilitiesPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2026
- Pages: 10
- PDF Size: 1.721 Mb.
- Unique ID: P-05700-Q2S2Y0