Skip to main content
Conference Proceedings

Strategic Mine Planning Conference Proceeding 2026

Conference Proceedings

Strategic Mine Planning Conference Proceeding 2026

PDF Add to cart

Effects of non-stationary geostatistical simulation on open pit production scheduling

Strategic open pit mine planning aims to maximise the expected net present value (ENPV) of an extraction sequence while accounting for geological uncertainty and grade variability. Geological uncertainty is commonly characterised through conditional simulations built on stationary variogram models and a fixed, domain-wide search ellipsoid. In structurally complex ore deposits, however, mineralisation is controlled by complex faults, folds, and curvilinear features that induce locally varying anisotropy. The stationarity assumption is then violated, which can inflate simulated variability, over smooth high-grade zones, and propagate excessive uncertainty into production schedules and cash flow forecasts. This study evaluates whether incorporating non-stationary simulation inputs into a mine planning workflow yields measurable improvements in resource representation and scheduled value. A locally adaptive algorithm, the Adaptive Search Ellipsoid (ASE), is integrated into Sequential Gaussian Simulation (SGS) so that the orientation and ranges of the search ellipsoid vary locally with the data configuration. Unlike non-Euclidean locally varying anisotropy formulations, ASE retains a Euclidean grid and requires no externally supplied structural field, which keeps the method tractable for industrial block models. The framework is applied to the McLaughlin gold deposit (northern California, USA). Ten realisations are produced with conventional SGS and ten with ASE-SGS; their E-type means are used as inputs to a ten-year open pit Direct Block Scheduling (DBS) optimisation. Performance is compared in terms of block scale coefficient of variation, swath behaviour, grade-tonnage relationships, annual mill-feed grade, and discounted cash flow. ASE-SGS reduces median block scale uncertainty, recovers more high-grade tonnage above the marginal cut-off, and yields a higher discounted cash flow than conventional SGS over the planning horizon. The findings indicate that locally adaptive simulation can materially affect long-term planning in structurally complex precious-metal deposits and motivate full propagation of realisations through stochastic optimisation in future work.
Return to parent product
  • Effects of non-stationary geostatistical simulation on open pit production scheduling
    PDF
    This product is exclusive to Digital library subscription
  • Effects of non-stationary geostatistical simulation on open pit production scheduling
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2026
  • Pages: 18
  • PDF Size: 3.219 Mb.
  • Unique ID: P-05710-N9Z2V3

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.