Skip to main content
Conference Proceedings

Strategic Mine Planning Conference Proceeding 2026

Conference Proceedings

Strategic Mine Planning Conference Proceeding 2026

PDF Add to cart

Generating operational mine schedule using a stochastic block-based simultaneous optimisation framework

Conventional strategic mine planning relies on deterministic resource models and an optimisation workflow supported by phase-bench scheduling assumptions, in which massive aggregations of blocks into benches or panels are homogenously extracted across periods. This approach misrepresents grade variability, recoverable tonnages and grades, and an asset’s full economic potential since it departs from the selective mining unit (SMU) typically represented at block scale. Over the past decades, advanced simultaneous stochastic optimisation of mining complexes (SSOMC) allowed to model the complexity of block granularity decisions, global optimisation and stochastic mathematical formulations, as well as the ability to solve the extremely large models. However, existing formulations, despite incorporating constraints such as mining width and sink rates, still lack the operational practicality ensured by mine design, leaving a gap between blockscale optimisation and practical execution. This paper presents a three-step stochastic framework bridging this gap by integrating geological uncertainty into practical stochastic mine scheduling while preserving block-level selectivity. The methodology: (1) applies existing SSOMC guided by geostatistical simulations to generate optimal and risk-resilient block-based extraction sequences; (2) defines phases by grouping yearly periods subsequently mine-designed, accounting for dilution, ore loss, and practical mining constraints; and (3) applies an adapted SSOMC that reintroduces designed phases as hard precedence constraints while maintaining block granularity and uncertainty management. The framework is demonstrated on an open pit iron ore case study benchmarked against a conventional deterministic plan. Risk analysis of the conventional schedule revealed a probable (P50) net present value (NPV) decrease of -8 per cent and 30 per cent probability of missing the mill target. The proposed phase-bench stochastic scheduler (PBS) delivered a probable (P50) NPV improvement of +2 per cent over the conventional expected value (+11 per cent relative to risk-adjusted baseline), while consistently meeting the mill target across all periods and satisfying critical operational constraints. These results demonstrate the framework produces risk-resilient and practical long-term mine plans.
Return to parent product
  • Generating operational mine schedule using a stochastic block-based simultaneous optimisation framework
    PDF
    This product is exclusive to Digital library subscription
  • Generating operational mine schedule using a stochastic block-based simultaneous optimisation framework
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2026
  • Pages: 10
  • PDF Size: 0.681 Mb.
  • Unique ID: P-05729-N9T6M5

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.