Conference Proceedings
Strategic Mine Planning Conference Proceeding 2026
Conference Proceedings
Strategic Mine Planning Conference Proceeding 2026
Incorporating maintenance-driven equipment costs into mine planning
The purpose of this paper is to show how different levels of sustaining capital costs, as well as different maintenance costs due to alternative maintenance scenarios can impact the results of strategic mine planning. With regard to maintenance costs, two alternative strategies for performing maintenance procedures were assumed, involving a different ratio between corrective and preventive maintenance operations. Sustaining capital costs and maintenance costs per annum are based on the piecewise decaying availability of the equipment according to the specified Generalised Renewal Process (GRP) model. Such formulation allows to simulate equipment failures and the associated maintenance procedures on an extended period of several years of life-of-mine operation, rather than assuming constant and time invariant equipment-related costs. As a result, the selection of maintenance strategy should allow not only technical factors to be considered, but also economic, financial and mine-planning implications of maintenance activities. For example, rebuilding or overhaul of the equipment will lead to a sharp improvement in its reliability, while also temporarily reducing maintenance costs for sequential periods by restoring part of the equipment condition. But with ageing equipment and accumulated degradation, probability of failure increases and further maintenance activities are required. Thus, this model makes it possible to take into account the interrelations between the current equipment condition, its maintenance strategy, cost accumulation and production scheduling. Finally, to show the potential implications of the suggested approach for strategic mine planning, a case study analysis is conducted on the benchmark Marvin deposit. Specifically, this research explores how various maintenance-related costs, involving both preventive and corrective activities, will influence strategically important mine planning results such as pit limit determination, mine scheduling, cash flow formation and the ultimate value of the project. Consequently, this paper aims to provide a practical tool to mine planners by presenting a model for estimating equipment-related costs in more realistic terms.
Contributor(s):
D Kaykov, M Kumral
-
SubscribeIncorporating maintenance-driven equipment costs into mine planningPDFThis product is exclusive to Digital library subscription
-
Add to cartIncorporating maintenance-driven equipment costs into mine planningPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2026
- Pages: 16
- PDF Size: 1.221 Mb.
- Unique ID: P-05708-L7K2R4