Conference Proceedings
Strategic Mine Planning Conference Proceeding 2026
Conference Proceedings
Strategic Mine Planning Conference Proceeding 2026
Integrating planning horizons and capital investments for mining complexes with uncertainty using multi-level stochastic optimisation
Conventional mine planning makes capital investment decisions and long-term or strategic plans which set production targets for short-term or tactical planning. However, these targets may not be achievable because the strategic plan does not consider the level of operational detail that is present in tactical planning. Integrating time horizons and capital investments can ensure that targets are achievable in the short-term and long-term decisions are optimal. The proposed framework evaluates the first year of the long-term plan as a 12-month tactical schedule during the hyperheuristic driven optimisation of strategic decisions. Specifically, the assessment of shovel movement feasibility and the characteristics of process material are more precise which allows the strategic optimisation to consider short-term feasibility. Risk is managed by accounting for uncertainty in the mineral deposits and processing performance. A case study at an open pit gold mining complex demonstrates the method, showing improved target compliance in the short-term and higher expected discounted cash flows in the long-term.
Contributor(s):
L Findlay, R Dimitrakopoulos
-
SubscribeIntegrating planning horizons and capital investments for mining complexes with uncertainty using multi-level stochastic optimisationPDFThis product is exclusive to Digital library subscription
-
Add to cartIntegrating planning horizons and capital investments for mining complexes with uncertainty using multi-level stochastic optimisationPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2026
- Pages: 6
- PDF Size: 0.854 Mb.
- Unique ID: P-05723-X1D0P9