Skip to main content
Conference Proceedings

Strategic Mine Planning Conference Proceeding 2026

Conference Proceedings

Strategic Mine Planning Conference Proceeding 2026

PDF Add to cart

Multi-objective blast optimisation as a decision variable in mine production scheduling

Production scheduling in open pit and underground mining is traditionally performed using deterministic or stochastic optimisation frameworks that assume fixed blast performance and static dig rates. Modern schedulers such as Micromine’s Alastri Production Scheduler excel at handling precedence, capacity, and blending constraints. However, they typically treat blasting as an implicit activity, without direct consideration of vibration response or blast-induced operational variability. This abstraction limits their applicability in vibration-sensitive environments, where many mining operations are located. This research presents an integrated optimisation framework that couples machine-learning-based, vibration-constrained blast design with short- to medium-term production scheduling. A supervised learning model is used to predict Peak Particle Velocity (PPV) from controllable blast parameters, and this predictor is embedded within a multi-objective optimisation engine that generates executable blast designs and polygons. Each optimised blast configuration is implemented into an improved production schedule which is characterised by tonnage, diggability-informed productivity, PPV exceedance probability, and feasible execution time frame. The proposed framework interfaces with production schedulers by supplying adaptive task attributes rather than static assumptions. Thus enable blast level decisions to directly influence schedule feasibility, equipment utilisation, and risk exposure. In open pit applications, vibration-aware blast designs will then modify short-term extraction sequences and productivity assumptions. The machine-learning-based PPV predictor and multi-objective optimisation engine consistently generated executable blast polygons that complied with approved ultimate pit design, bench geometries, and sequencing rules while meeting production tonnage targets. When incorporated into scheduling, vibration-aware blast designs provided adaptive task attributes, reducing infeasible or high-risk schedules near sensitive receptors and improving spatial conformance. The results show that treating blast design as an explicit, optimised decision variable enables physics-informed, spatially conformant, and risk-aware production scheduling without altering the core optimisation engines of existing schedulers.
Return to parent product
  • Multi-objective blast optimisation as a decision variable in mine production scheduling
    PDF
    This product is exclusive to Digital library subscription
  • Multi-objective blast optimisation as a decision variable in mine production scheduling
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2026
  • Pages: 12
  • PDF Size: 0.456 Mb.
  • Unique ID: P-05709-K9T2S5

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.