Conference Proceedings
Strategic Mine Planning Conference Proceeding 2026
Conference Proceedings
Strategic Mine Planning Conference Proceeding 2026
Strategic optimisation of the Voisey’s Bay mining and processing value chain
Vale’s Newfoundland and Labrador portfolio comprises the Voisey’s Bay (VB) mining complex, concentrator, and the Long Harbour Processing Plant (LHPP). VB is a major nickel–copper–cobalt operation with three active mines (two underground and one open pit) and multiple proximal and regional resource opportunities that could be developed through mine expansions or new operations. All ore mined at VB is processed on-site, with concentrates feeding both external markets and LHPP for refining into finished nickel, cobalt, and copper products. Following depletion of the Ovoid open pit, the remaining mines no longer generate sufficient concentrate to operate LHPP at nameplate capacity, necessitating the purchase of external feed and materially reducing portfolio margins. The strong interdependencies across the mining, milling, and processing assets, combined with a large inventory of future development options, highlight the need for integrated, enterprise-level optimisation of the entire value chain (Whittle, 2010; Goodfellow and Dimitrakopoulos, 2017). This paper presents the application of advanced mathematical optimisation to develop a comprehensive strategic model encompassing all current and potential mining areas at VB, operational constraints, external feed obligations, capital requirements, and downstream value‑chain linkages. The model was calibrated to Vale’s official Newfoundland and Labrador financial model and used to optimise both the existing base‑case mine plan and a long‑term Resource Development Plan. Optimisation of the base‑case plan identified significant opportunities to increase value through improved mining sequences, debottlenecking constrained processes, and targeted capital deployment. These changes enable VB to fully supply LHPP from internal feed for an extended period, significantly defer reliance on external feed and increase portfolio net present value by approximately 90 per cent. Extension of the optimisation to include all future resource opportunities demonstrates the potential to extend the life of the VB complex by more than 20 years and deliver a further approximately 70 per cent, representing a total uplift of approximately 160 per cent. This case study demonstrates how enterprise‑level optimisation and integrated value‑chain planning translate strategic intent into executable, value‑accretive development pathways across a complex, vertically integrated mining operation.
Contributor(s):
D Galloway, R Mallett, B Gadelha, L Montiel, T Câmara, J Todd
-
SubscribeStrategic optimisation of the Voisey’s Bay mining and processing value chainPDFThis product is exclusive to Digital library subscription
-
Add to cartStrategic optimisation of the Voisey’s Bay mining and processing value chainPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2026
- Pages: 12
- PDF Size: 0.37 Mb.
- Unique ID: P-05725-G3D0V9