Strategic value optimisation for an integrated copper open pits and underground mining complex
This study examines the integration of two copper deposits—one developed as an open pit and the other combining open‑pit and underground mining, for a total of three operating sources—located within the same region. The objective was to evaluate potential synergies through shared use of a centralised processing plant and tailings storage facilities. The integrated mine plan was built around the proposed plant capacity of the most advanced project and assessed possible mill expansions supported by incremental capital expenditure (CAPEX) to process additional ore, considering licensing timelines and operational constraints (ie total primary mining movement). Multiple startyear scenarios were modelled, accounting for underground development requirements and alternative open pit/underground transition strategies. A strategic planning tool enabled ore blending through cut-off grade optimisation from all three operations to optimise copper grades and plant utilisation. Sensitivity analyses on CAPEX, operating costs (OPEX), and cost assumptions were conducted to validate outcomes. Results show that integration increases net present value (NPV) relative to stand-alone cases, creating significant value and improving resource and infrastructure use. In some scenarios, NPV peaked at levels that were operationally infeasible due to life-of-mine (LOM) limitations. Across all approaches, plant expansion to four times the base capacity was only viable under optimistic cost and price assumptions, while a more conservative view supports expansion up to three times capacity. The methodology also allowed the use of variable cut‑off grades to determine the optimal plant size, balancing financial returns and operational feasibility.
Contributor(s):
B Gadelha, T Câmara, L Montiel, J Todd
-
SubscribeStrategic value optimisation for an integrated copper open pits and underground mining complexPDFThis product is exclusive to Digital library subscription
-
Add to cartStrategic value optimisation for an integrated copper open pits and underground mining complexPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2026
- Pages: 6
- PDF Size: 0.265 Mb.
- Unique ID: P-05724-Y7Y3D6