Conference Proceedings
Strategic Mine Planning Conference Proceeding 2026
Conference Proceedings
Strategic Mine Planning Conference Proceeding 2026
Transforming mine planning – auto-design rules for rapid underground layouts in Deswik and Datamine
Mine design is a fundamental component of mine planning, forming the backbone of every mining project from its inception through implementation and throughout the life of the mine. Accurate and efficient design is essential for evaluating project feasibility and ensuring operational success. Traditionally, underground mine design involves manual creation of strings and shapes within specialised software such as Deswik and Datamine. While these tools are powerful, the process of generating preliminary designs can be time-consuming, often delaying critical stages of mining studies and decision-making, and consuming resources that could be used elsewhere. With increasing pressure to complete mining studies faster and test more strategic scenarios, there is a growing need for repeatable, transparent and auditable design workflows. Recognising this need, AMC Consultants (AMC) has leveraged the capabilities of Deswik and Datamine to develop automated design rules that streamline the underground mine design process. These rules enable engineers to rapidly generate preliminary layouts and shapes, reducing reliance on manual drafting and minimising repetitive tasks. The process can also be used to produce inputs into AMC’s Hill of Value® strategic optimisation framework, reducing the effort involved in producing mine designs for multiple options or cut-offs, whilst still delivering maximum strategic value. For these automated design rules to be reliable, each rule set must be supported by clearly defined input data requirements, design assumptions, parameter ranges, geometry constraints, output classifications and quality assurance (QA) checks. Required controls include validation of stope access connectivity, minimum gradient and turning-radius compliance, development-category reconciliation, exception reporting, version control of rule sets, documentation of manual edits, and senior engineering review before outputs are used for scheduling, cost estimation or study reporting. The implementation of these automated rules has resulted in substantial efficiency gains. After initial rule set-up, individual inventory designs can be generated in minutes rather than days, while projectspecific rule modification for advanced users typically requires only a few hours. This improvement accelerates project timelines and enhances the ability to conduct multiple design iterations, optimise layouts, and improve overall project evaluation. By integrating automation into established mine design platforms, AMC demonstrates how innovative approaches can transform traditional workflows, delivering faster, more consistent, and cost-effective outcomes for underground mining projects. This paper explores the methodology behind developing automated design rules in Deswik and Datamine, highlights the practical benefits observed in real-world applications, and discusses the engineering controls required to use rule-based design outputs responsibly. The findings underscore the importance of transparent assumptions, repeatable workflows, validation checks and senior engineering review when applying automated design methods to underground mining studies.
Contributor(s):
A Saxena, J R Town
-
SubscribeTransforming mine planning – auto-design rules for rapid underground layouts in Deswik and DataminePDFThis product is exclusive to Digital library subscription
-
Add to cartTransforming mine planning – auto-design rules for rapid underground layouts in Deswik and DataminePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2026
- Pages: 18
- PDF Size: 0.658 Mb.
- Unique ID: P-05742-B0N7F7