Conference Proceedings
Strategic Mine Planning Conference Proceeding 2026
Conference Proceedings
Strategic Mine Planning Conference Proceeding 2026
Unlocking opportunities through a stochastic production plan optimisation of an iron ore greenfield mining project
Geological uncertainty and variability are inherent to mine planning, largely due to budget constraints that prevent systematically sampling and thorough characterisation of mineral deposit. Recognising uncertainty from different sources, particularly related to the mineralisation, is essential to moreinformed decision-making. This is especially important during the exploration stage, when project parameters and aspects can still be adjusted at relatively low cost. This work presents a case study consisting of a single mine where two mineral processing routes are available for generating iron ore concentrates: direct shipping ore (DSO) and pellet feed (PF). The DSO plant involves only a comminution circuit and requires an important control over the feeding ore’s iron grade. The PF plant incorporates milling and flotation circuits, which increases processing costs but generates more valuable products. To evaluate this project, stochastic simulations of the orebody model were generated to quantify uncertainty in iron grades and deleterious elements, such as silica, phosphorous and manganese. These simulations were inputted into a stochastic production planning optimiser to generate risk-resilient production schedules to maximise the project’s net profit value (NPV) and mitigate the risk of not meeting production targets. Three scenarios are evaluated in attempt to capture the full economic potential of the project: Case 1 considers a stochastic optimisation using only measure and indicated resources are treated as candidates to feed the processing plant. Next, inferred resource are also incorporated into the model to investigate extending the life-of-mine (LOM) (Case 2). Lastly, optimistic prices for iron ore concentrates are applied to explore additional benefits of a best-case scenario (Case 3). A deterministic production plan was also developed and used as baseline for comparison. In this workflow, the grades of interest were estimated into the orebody model as this was used as input for the optimiser. Case 1 outperformed the baseline, increasing the overall production of iron ore concentrate by 6.1 per cent, having additional 16 per cent DSO product, and extending the LOM by two periods. This is explained by the smoothing effect of estimation methods that underestimated the high-grades mostly associated with hematite ore. Additionally, Case 2 further extended the LOM and increased the production of iron ore concentrate by 6.2 per cent compared to Case 1. The production schedule presented in Case 3 do not differ drastically from Case 2, in terms ore processed and products generated; however, the increase in NPV is substantial, highlighting the project’s potential for stronger financial performance under favourable market conditions.
Contributor(s):
J Carvalho, A Mayrink, A Amaral, D Barbosa, A Ditlef, G Santos, A Silva
-
SubscribeUnlocking opportunities through a stochastic production plan optimisation of an iron ore greenfield mining projectPDFThis product is exclusive to Digital library subscription
-
Add to cartUnlocking opportunities through a stochastic production plan optimisation of an iron ore greenfield mining projectPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2026
- Pages: 12
- PDF Size: 1.775 Mb.
- Unique ID: P-05728-T7M9F0