Unlocking value in mining projects – a stochastic mine planning workflow for complex gold-copper leach operations under geological uncertainty

Complex gold-copper deposits pose non-trivial strategic planning challenges for mine projects: several economic elements and ore types must be optimised at once, cut-off decisions depend on more than one metal and blending and product tonnages respond to reward and cost structures that change over time. Conventional workflows for long-term mine planning attempt to resolve these decisions sequentially from a single estimated block model (Whittle, 1990; Hustrulid, Kuchta and Martin, 2013): pit and phase limits ignore product synergies, cut-off grades rely on metrics such as equivalent grades and deterministic forecasts are exposed to non-compliance because variability is smoothed out and uncertainty is not accounted for (Ravenscroft, 1992; Dimitrakopoulos, Farrelly and Godoy, 2002; Dimitrakopoulos and Ramazan, 2009; Asad and Dimitrakopoulos, 2013). Shortcomings intensify when considering geological uncertainty, which affects the grade’s spatial distribution, grade proportions, and correlations between metals if more than one. Stochastic mine planning replaces the estimated model with geostatistical simulations that reproduce variability and quantify uncertainty of the available data (Goovaerts, 1997; Boucher and Dimitrakopoulos, 2009). Risk analysis then measures, in space and time, the risk attached to a pit geometry and production schedule, surpassing traditional sensitivity studies (Ravenscroft, 1992; Dowd, 1994; Dimitrakopoulos and Ramazan, 2009). The simultaneous stochastic optimisation of mining complexes used in this case study generates the extraction sequence, destinations and material flows concurrently, maximising value and managing risk associated with the production targets of the mining complex (Goodfellow and Dimitrakopoulos, 2016, 2017; Dimitrakopoulos and Lamghari, 2022). This study presents a complete simultaneous stochastic optimisation workflow applied to a goldcopper heap-leach operation – a multi-mine mining complex (two open pits) with oxide, mixed and sulfide ore and a hard physical limit on leach-pad capacity. The workflow advances through four integrated stages: (1) geostatistical simulations; (2) risk analysis of the deterministic plan; (3) direct block scheduling through the simultaneous stochastic optimisation of mining complexes; and (4) the generation of operationalised mine pushbacks based on stochastic optimisation, closing the gap between an optimal schedule and an executable phase design.
Return to parent product
  • Unlocking value in mining projects – a stochastic mine planning workflow for complex gold-copper leach operations under geological uncertainty
    PDF
    This product is exclusive to Digital library subscription
  • Unlocking value in mining projects – a stochastic mine planning workflow for complex gold-copper leach operations under geological uncertainty
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2026
  • Pages: 4
  • PDF Size: 0.683 Mb.
  • Unique ID: P-05691-L1J7P7

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.