Conference Proceedings
Strategic Mine Planning Conference Proceeding 2026
Conference Proceedings
Strategic Mine Planning Conference Proceeding 2026
Why mine plans fail – value, predictability, flexibility and sustainability
In the mining sector, mine plan quality has direct capital market consequences. Investors reward predictable delivery and credible growth, and they penalise repeated guidance misses. In practice, many plans fail because deterministic schedules are applied to operating systems shaped by geological, operational, processing, and external uncertainties. This paper argues that effective mine planning should be understood as the design of a robust operating strategy rather than the production of a static schedule. A successful plan must achieve four objectives simultaneously: maximise durable value, support predictable execution, ensure sustainability, and preserve enough flexibility to absorb deviations without damaging long-term performance. To develop a practical framework that makes these plans resilient, this approach emphasises the necessity of credible geological inputs, realistic operating constraints, integrated mine-to-market logic, explicit treatment of uncertainty, and predesigned contingencies that can be activated before a disruption becomes value-destructive.
Contributor(s):
M Godoy
-
SubscribeWhy mine plans fail – value, predictability, flexibility and sustainabilityPDFThis product is exclusive to Digital library subscription
-
Add to cartWhy mine plans fail – value, predictability, flexibility and sustainabilityPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2026
- Pages: 8
- PDF Size: 0.226 Mb.
- Unique ID: P-05688-P1G6G0