Conference Proceedings
The AusIMM Proceedings 1938
Conference Proceedings
The AusIMM Proceedings 1938
Mining Methods and Costs at the Mount Isa Mines Ltd., Mount Isa, Queensland, Australia
The Mount Isa property has been in operation since June, 1931; during this period operations have changed from the production and treatment of carbonate ores to the mining, milling, and smelting of sulphide ores. This change involved revision of ore-extraction methods.Stoping methods have been designed to apply to parallel lodes ranging from 10 ft. to over 100 ft. in width and dipping at 50 to 60. The hardness and strength of the ore and enclosing wall rocks, together with the strength and thickness of the country rock between lodes, have permitted the selection of a sub-level stoping method for mining the sulphide ores.
Contributor(s):
J Kruttschnitt, V I Mann
-
Mining Methods and Costs at the Mount Isa Mines Ltd., Mount Isa, Queensland, AustraliaPDFThis product is exclusive to Digital library subscription
-
Mining Methods and Costs at the Mount Isa Mines Ltd., Mount Isa, Queensland, AustraliaPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1937
- PDF Size: 4.659 Mb.
- Unique ID: P_PROC1938_0449