Skip to main content
Conference Proceedings

The AusIMM Proceedings 1938

Conference Proceedings

The AusIMM Proceedings 1938

PDF Add to cart

Mining Methods and Costs at the Mount Isa Mines Ltd., Mount Isa, Queensland, Australia

The Mount Isa property has been in operation since June, 1931; during this period operations have changed from the production and treatment of carbonate ores to the mining, milling, and smelting of sulphide ores. This change involved revision of ore-extraction methods.Stoping methods have been designed to apply to parallel lodes ranging from 10 ft. to over 100 ft. in width and dipping at 50 to 60. The hardness and strength of the ore and enclosing wall rocks, together with the strength and thickness of the country rock between lodes, have permitted the selection of a sub-level stoping method for mining the sulphide ores.
Return to parent product
  • Mining Methods and Costs at the Mount Isa Mines Ltd., Mount Isa, Queensland, Australia
    PDF
    This product is exclusive to Digital library subscription
  • Mining Methods and Costs at the Mount Isa Mines Ltd., Mount Isa, Queensland, Australia
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1937
  • PDF Size: 4.659 Mb.
  • Unique ID: P_PROC1938_0449

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.