Skip to main content
Conference Proceedings

The AusIMM Proceedings 1944

Conference Proceedings

The AusIMM Proceedings 1944

PDF Add to cart

Removal of Horizontal Level Pillar by Means of Blast Hole Diamond Drilling at New Occidental Gold Mine, Cobar, N.S.W.

The removal of a horizontal piIlar between Nos. 9 and 11 levels (1,116 feet from the collar of main shaft) was successfully carried out by blast hole drilling, and, to the best of the authors' knowledge, this mass blast of 40,000 tons of ore (requiring the use of 7,150 Ibs. of explosive and 5,385 feet of primacord) was the first occasion on which a task of this magnitude has been carried out underground in an Australian mine.Blast hole drilling was introduced by this company approximately fifteen months ago at New Cobar Mine in sub-level stoping.This experimental drilling and blasting gave very valuable information as to the correct technique to be adopted when the final plans were being prepared for the removal of the horizontal pillar at New Occidental Mine.The dimensions of this pillar were approximately 15 feet long, and from 40 to 60 feet wide, and 65 feet in depth.The block of ore extended to 35 feet above the level and 30 feet below, the upper section being partially excavated to form the bell-hole floor and grizzly chambers used for drawing off the broken ore in the shrink stope above the No. 10 level.Description of Ore-bodyThe main ore-body is situated almost vertically in a well-defined shear zone at the junction of sandstone and slate, the sandstone forming the eastern and the slate the western wall.The ore-body consists of highly silicified slate (chert) sparsely impregnated with sulphides, containing a small percentage of copper and bismuth.The total length of the ore-body is approximately 450 feet, with a maximum width of 60 feet in the main section, which is about 200 feet long.This is the section shown in longitudinal and cross-section (Fig. 1).The ore-body is divided by a horse of mullock in the northern end into two legs, the eastern and western, which are approximately 250 feet long and averaging 25 feet in width.This ore-body is strong, hard and abrasive with extremely strong walls, an ideal proposition for open stoping and mass blasting.MiningIn all levels above No. 9 the cut and fill method of ore extraction was adopted. On Nos. 10 and 11 levels the shrinkage method was introduced with economical results, and no difficulty had ever been experienced with shabby or bad walls.Shrink stoping had been carried upwards from No. 11 level to within 10 feet of No. 10 level, when mining hazards developed, and instead of...
Return to parent product
  • Removal of Horizontal Level Pillar by Means of Blast Hole Diamond Drilling at New Occidental Gold Mine, Cobar, N.S.W.
    PDF
    This product is exclusive to Digital library subscription
  • Removal of Horizontal Level Pillar by Means of Blast Hole Diamond Drilling at New Occidental Gold Mine, Cobar, N.S.W.
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1944
  • PDF Size: 0.669 Mb.
  • Unique ID: P_PROC1944_0567

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.