Skip to main content
Conference Proceedings

The AusIMM Proceedings 1973

Conference Proceedings

The AusIMM Proceedings 1973

PDF Add to cart

Reclamation by Sluicing of Tailing Impounded in a Valley at Electrolytic Zinc Company of Australasia Ltd., Rosebery, Tasmania

A unique sluicing process for recovering tailing impounded in a valley was developed by Electrolytic Zinc Company of Australasia Ltd., West Coast Mines, Rosebery, Tasmania.Earthmoving equipment could not be used as most of the material to be recovered was semi-fluid. A conventional sluking method was also impracticable as there was no suitable working face from which the process could be commenced.Operations started from a flat surface, using special techniques for sinking through the tailing and establishing producing working faces as the sinking process continued.After about 2 years the bottom of the dam was reached and conventional sluicing methods could be used.
Return to parent product
  • Reclamation by Sluicing of Tailing Impounded in a Valley at Electrolytic Zinc Company of Australasia Ltd., Rosebery, Tasmania
    PDF
    This product is exclusive to Digital library subscription
  • Reclamation by Sluicing of Tailing Impounded in a Valley at Electrolytic Zinc Company of Australasia Ltd., Rosebery, Tasmania
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1973
  • PDF Size: 4.307 Mb.
  • Unique ID: P_PROC1973_1346

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.