Conference Proceedings
The AusIMM Proceedings 1983
Conference Proceedings
The AusIMM Proceedings 1983
Recovery of Cooper from Copper-Lead Dross
Copper in zinc/lead sinter charged to the Imperial Smelting Furnace operated by Sulphide Corporation Pty Limited at Cockle Creek, New South Wales, concentrates in a complex lead dross which forms as the bullion is cooled to around 400C. The 0.35 mm portion of this dross, containing approximatelY 67 per cent of the total copper, is treated via a hydrometallurgical route to produce 5000 tonne/yr of CuSO4 5H2O crystal.Around 3000 tonne/yr of copper-lead dross containing 49 per cent copper is leached at 55C in continuous leach reactors with ammoniacal ammonium carbonate leach liquors to convert copper to soluble copper amine complexes. Leach ettlciencies of 80-85 per cent are obtained. Leach residues are repulped with ammoniacal liquid diluents from the plant and heated in a four stage steam distillation unit to reduce ammonia levels to between 0.5 and 1.0 g/Iitre. The resultant slurry is directed to an effluent treatment plant for final treatment, and separation and return of solids to the sinter plant.Copper is extracted from leach liquor by solvent extraction techniques based on the use of L1X 54 diluted 3:1 with Shellsol 2046 to give a nominal copper loading of 30 g/litre. The loaded organic is contacted with a sulfuric acid solution of pH 5 to remove the bulk of ammonia and zinc, then stripped at 55C with a 60 g/Iitre H2SO4 95 g/Iitre copper solution to yield a 15 g/Iitre H2SO4 125 g/Iitre copper solution.This liquor is fed to an adiabatic vacuum crvstalliser operating at 35C and 5 kPa vacuum where crystals of CuSO4 5H2O are formed. Crystals are separated from mother liquor and washed in a two stage pusher centrifuge, then dried in a hot air rotary drier. The crystal product obtained is of a high chemical purity and readily conforms to both Australian and overseas standards.
Contributor(s):
E J Burns, A F Arthur, I H MacKenzie
-
Recovery of Cooper from Copper-Lead DrossPDFThis product is exclusive to Digital library subscription
-
Recovery of Cooper from Copper-Lead DrossPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1983
- PDF Size: 0.934 Mb.
- Unique ID: P_PROC1983_1586