Conference Proceedings
Third International Mining Geology Conference
Conference Proceedings
Third International Mining Geology Conference
Development of Grade Control Systems at the Mt Muro Au-Ag Project, Central Kalimantan, Indonesia
The Mt Muro gold and silver deposit in Central Kalimantan has been in production since December 1994. The geology is characterised by narrow high-grade lodes containing gold and significant amounts of silver. From a largely untrained workforce in the grade control department, production per crew and per geologist has tripled during the three years of production. Grade control drilling evolved from blast hole sampling to reverse circulation sampling. National geologists are trained in basic modeling procedures. A fully integrated reporting and reconciliation system was programed and implemented.
Contributor(s):
H Hoogvliet
-
Development of Grade Control Systems at the Mt Muro Au-Ag Project, Central Kalimantan, IndonesiaPDFThis product is exclusive to Digital library subscription
-
Development of Grade Control Systems at the Mt Muro Au-Ag Project, Central Kalimantan, IndonesiaPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1996
- PDF Size: 0.66 Mb.
- Unique ID: P199706005