Skip to main content
Conference Proceedings

Third International Mining Geology Conference

Conference Proceedings

Third International Mining Geology Conference

PDF Add to cart

Geological Modelling of a Stoping Block at BHP's Cannington Ag-Pb-Zn Mine

Production of oic at BHP Minerals Pty Ltd's Cannington Mine commenced in May 1997. The initial sloping blocks at the [nine are located in the upper part of the Footwall Lead lode, and the Hangingwall Lead and Glenholme Breccia lodes. This paper discusses the geological investigations, interpretation and modelling that was undertaken for the Footwall Lead lode production block at Cannington Mine, as well as providing a basic geological introduction to the Cannington deposit.
Return to parent product
  • Geological Modelling of a Stoping Block at BHP's Cannington Ag-Pb-Zn Mine
    PDF
    This product is exclusive to Digital library subscription
  • Geological Modelling of a Stoping Block at BHP's Cannington Ag-Pb-Zn Mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1996
  • PDF Size: 0.392 Mb.
  • Unique ID: P199706012

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.