Conference Proceedings
Third International Mining Geology Conference
Conference Proceedings
Third International Mining Geology Conference
Geological Modelling of a Stoping Block at BHP's Cannington Ag-Pb-Zn Mine
Production of oic at BHP Minerals Pty Ltd's Cannington Mine commenced in May 1997. The initial sloping blocks at the [nine are located in the upper part of the Footwall Lead lode, and the Hangingwall Lead and Glenholme Breccia lodes. This paper discusses the geological investigations, interpretation and modelling that was undertaken for the Footwall Lead lode production block at Cannington Mine, as well as providing a basic geological introduction to the Cannington deposit.
Contributor(s):
G Streeton
-
SubscribeGeological Modelling of a Stoping Block at BHP's Cannington Ag-Pb-Zn MinePDFThis product is exclusive to Digital library subscription
-
Add to cartGeological Modelling of a Stoping Block at BHP's Cannington Ag-Pb-Zn MinePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1996
- PDF Size: 0.392 Mb.
- Unique ID: P199706012