Skip to main content
Conference Proceedings

Third Large Open Pit Mining Conference, Mackay, August 1992

Conference Proceedings

Third Large Open Pit Mining Conference, Mackay, August 1992

Add to cart

Papers in collection

  • A Case Study on the Technical and Safety Aspects of the Robe River Experience Go to Paper
  • Advances in Highwall Mining Go to Paper
  • An Economically Viable Method of Dragline Mining in Weak Unstable Ground at German Creek Mine, Central Queensland Go to Paper
  • Benchmarks of Performance for Truck and Loader Fleets Go to Paper
  • Blast Design System Go to Paper
  • Blast Profile Control for Dragline Productivity Optimisation Go to Paper
  • Clermont Coal Project Mine Plan Go to Paper
  • Co-Disposal of Coal Mine Tailings and Coarse Reject Go to Paper
  • Cost Effective Blasting - A Case Study Go to Paper
  • Cut-and-Break, a 'New' Method of Rock Excavation Go to Paper
  • Damage to Open Pit Slopes Go to Paper
  • Design and Rehabilitation of Large External Waste Dumps: a Case Study Go to Paper
  • Designer - A Spreadsheet for Determining the Most Cost-Effective Explosive for an Open Cut Blast Go to Paper
  • Development of Drilling and Blasting Practices at The Vickery Coal Mine Go to Paper
  • Development of Trials for Rehabilitation of a Bucket Wheel Excavator Spoil Dump Go to Paper
  • Developments to Enhance the Productivity and Cost-Effectiveness of Large Rotary Blasthole Drills Go to Paper
  • Dewatering and Subsequent Dragline Operations in Grevillea Pit - Saraji Mine Go to Paper
  • Dragline Performance Evaluations for Tarong Coal Using Physical Modelling Go to Paper
  • Dragline Tub and Roller Circle Repairs Go to Paper
  • Equipment Selection for Reclamation and Parting Removal Go to Paper
  • Escondida: A Case Study in Success and Innovation Go to Paper
  • Evaluation of a Dragline-Hopper-Truck Mining System Go to Paper
  • Experience at Goonyella/Riverside Mine with a Bucket Wheel Excavator System and Shovel/Truck Systems for Prestripping Overburden Go to Paper
  • Fundamentals of Open Pit Planning and Scheduling Go to Paper
  • Geological and Geotechnical Influences on Strip Mining Using In-Pit Bench Techniques Go to Paper
  • Grade Control - A Continuing Exercise in Quality Management Go to Paper
  • Highwall Trench Mining as a Primary Production Method of Coal Extraction Go to Paper
  • Highwall Trench Mining Research: Implications for Mine Planning Go to Paper
  • Horizontal Overburn Blast at Ulan Coal Mines Go to Paper
  • How Can You Justify Buying More Larger Equipment When Your Smaller Existing Equipment Isn't Worn Out? Go to Paper
  • Hydrotransportation of Raw Coal from Pit Face to Washplant Go to Paper
  • Improved Planning and Scheduling by Integration of Mining Application Softrware Go to Paper
  • Investigation into Cable Bolt Corrosion at Mt Whaleback Mine, Newman, Western Australia Go to Paper
  • Investigation of Coal Fines at Coal and Allied Hunter Valley Mine Go to Paper
  • Large Open Pit Mining in Papua New Guinea Go to Paper
  • Large Scale Open Pit Gold Operation - KCGM Go to Paper
  • Life of Mine Land Use Plan - Comalco Weipa Go to Paper
  • Maintaining and Improving the Economics of Open Pit Mining Go to Paper
  • Making Mines Perform Better Go to Paper
  • Mine Water Resource Management Systems Go to Paper
  • New Developments in High Productivity Excavators Go to Paper
  • Open Pit Mining - Keeping the New South Wales Industry Alive Go to Paper
  • Opportunities for Management for Australian Mining in the 1990s Go to Paper
  • Optimisation of Coal Production from Mine Face to Customer Go to Paper
  • Optimising Grade Control Procedures in Large and Small Open Pit Mines Go to Paper
  • Optimising Pit Slope Design at Kidston Gold Mines Go to Paper
  • Overburden Removal Activities Associated with the Yallourn Open Cut Township Field Go to Paper
  • Performance Characteristics of Dragline Buckets Go to Paper
  • Planning and Commencement of Rehabilitation at the Hedges Gold Mine WA Go to Paper
  • POWERWAVE RADAR and Applications to Improve Blasting Performance Go to Paper
  • Probablistic Analysis of Risk in Mining Projects - As Easy as 123 Go to Paper
  • PT Allied Indo Coal Go to Paper
  • Rehabilitation Strategies and Planning at Curragh Mine Go to Paper
  • Relocable Inpit Crushing and Conveying Systems Go to Paper
  • Review of Shear Strength Results - Western Australian Gold Mines Go to Paper
  • Risk Assessment for New Technology in the Open Cut - Wambo Dragline Go to Paper
  • Scheduling of Short Strike Length, Multiseam Dragline Operations Go to Paper
  • Spoil Pile Erosion Prediction - How Far Have We Advanced? Go to Paper
  • The Development and Operation of an Indonesian Open Pit Coal Mine Go to Paper
  • The Effect of Open Pit Scale Economies on the Mt Leyshon Gold Mine Go to Paper
  • The Role of Contractors in Open Pit Mining Go to Paper
  • The Role of Strategic Planning During the Establishment of Syferfontein Colliery Go to Paper
  • The Use and Abuse of Oriented Core in Open Pit Mine Design Go to Paper
  • Upstream Raising of Tailings Dams - Engineered Structures of Castles in the Air? Go to Paper
  • Use of Draglines - Where to in the 21st Century Go to Paper
  • Warkworth Mining Ltd Operations Go to Paper
  • Waste Dumps - The New Frontier Go to Paper
PD Hours
Approved activity
  • Published: 1992
  • Unique ID: PA-199208

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.