Application of steel bollards for managing the hazards associated with open stopes, Waihi Underground Operations

The Waihi underground mining operation currently mines epithermal veins ranging from two metres up to ten metres in width using a ‘Modified Avoca’ stoping method. This method consists of longhole bench stope mining at 15m to 18m sublevel spacing. The bulk of production drilling and blasting is top down with the extraction length of a typical stope panel nominally being 18m to 20m along strike. A stope panel is usually taken in two blasting cycles followed by the remote bogging of the stope ore. The panel is backfilled in-cycle using unconsolidated waste rock material which is tipped into the void from the upper level using a Caterpillar R2900 or R1700 sized underground loader.
The underground mine first commenced production in 2008 and up until 2016, as was typical of many open stope mining operations at the time, an underground loader was used to place a waste rock bund at the top brow of the open stope. This rock bund was the principal means of protecting people and equipment from this hazard. In 2016 there was a fatality at the mine when a loader that had been tasked with building this rock bund fell into the stope void. Immediately post incident all mining and processing operations were suspended for a week to allow colleagues to grieve, to observe cultural protocols and to begin the investigation into this event. During this period senior operators, supervisory and technical staff developed an innovative system which used steel bollards to protect this open edge. With development over the following months this bollard system has eliminated this hazard from the Waihi underground mine.
Return to parent product
  • Application of steel bollards for managing the hazards associated with open stopes, Waihi Underground Operations
    PDF
    This product is exclusive to Digital library subscription
  • Application of steel bollards for managing the hazards associated with open stopes, Waihi Underground Operations
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2021
  • Pages: 10
  • PDF Size: 0.472 Mb.
  • Unique ID: P-01506-V3G3Q7

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.