Skip to main content
Conference Proceedings

Underground Operators Conference 2021

Conference Proceedings

Underground Operators Conference 2021

PDF Add to cart

Maximising asset value through optimal block by block decisions on marginal material

It is challenging to determine the optimal mining strategy to maximise value when a mine plan includes mineralised material which does not meet the full cost of mining but has value exceeding the variable cost of mining (‘marginal material’). Mining too much marginal material dilutes the operation’s head grade and undermines profitability. Conversely, leaving too much metal behind fails to achieve the full value of the endowment. Finding the balance between the two will maximise value delivered from the asset.
This dilemma has traditionally been approached by calculating a suite of cut-off grades to define the grade of material that meets economic targets for an orebody (or zone within) and should therefore be included in the mine plan. A problem with this approach is that individual mining blocks within the zone have different costs, value and confidence levels, with each having economic co-dependencies between them. Blocks of identical grade but different mining contexts will have distinctly different economic outcomes.
For example:
• a block may be a low-grade increment or shell around a higher-grade stope;
• a block may be available to be mined when there is spare mining capacity; or
• a block may defer access to significantly higher cash flow material.
Each of these circumstances would result in different value from the blocks if included as part of the mine plan. Cut-off grades calculated as averages over zones of material, or in isolation from schedule-based information, are missing the entire mining context that determines the ultimate economic outcome of making a mining decision.
There are tools and techniques available to address this for open pit mining, however underground mining has different nuances. There are more intricate economic and physical dependencies between potential ore blocks, and importantly, the decision to leave material in situ can be made at any time.
The case study in this paper explores a new methodology for underground mining, targeted towards strategic planning applications. It examines whether the economic logic usually applied via cut-off calculations can be implemented in the schedule so that optimal economic decisions can be made on a block-by-block basis, taking into account the mining context of the block, with the objective to maximise asset value. The results of the case study scenarios in Table 1 demonstrate the magnitude of the potential improvement in NPV that can be attained by a block by block valuation approach
Return to parent product
  • Maximising asset value through optimal block by block decisions on marginal material
    PDF
    This product is exclusive to Digital library subscription
  • Maximising asset value through optimal block by block decisions on marginal material
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2021
  • Pages: 18
  • PDF Size: 1.232 Mb.
  • Unique ID: P-01543-Z8P7P9

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.