Skip to main content
Conference Proceedings

Underground Operators Conference Proceeding 2023

Conference Proceedings

Underground Operators Conference Proceeding 2023

PDF Add to cart

Planning for underground mining at Savage River Iron Ore Mine

This paper presents the evolution of the studies and strategic plans to extend the life of operations at the Savage River iron ore project in north-western Tasmania. The current Life-of-Mine (LOM) plan for the Savage River operations is based on a series of open pits. Drilling has confirmed high-grade extensions of the magnetite resource at depths that exceed practical limits for open pit mining. Grange Resources Limited, the owner of the operation, is investigating underground options – not only to extend the LOM plan but also to maintain peak production at a reduced operating cost while reducing greenhouse gas emissions into the future. What makes this project unique is that it requires introducing a productive and cost-effective mining method to exploit a challenging geotechnical and geometrical orebody in an area of high rainfall. To support the study efforts, the development of an exploration decline, underground drilling programs, and an exploratory drive excavated into the orebody for geotechnical investigation was key to providing the necessary data for a pre-feasibility study (PFS). This paper describes the pragmatic approach and processes to developing the underground mining options study through data collection and then integrating these options into the open pit plans to optimise an overall strategic plan for the Savage River operations. The learnings for operators from this experience are how the technical and pragmatic approaches were aligned to develop the strategic plans, and the importance of timely investment in gathering the necessary data.
Return to parent product
  • Planning for underground mining at Savage River Iron Ore Mine
    PDF
    This product is exclusive to Digital library subscription
  • Planning for underground mining at Savage River Iron Ore Mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2023
  • Pages: 10
  • PDF Size: 0.48 Mb.
  • Unique ID: P-02999-G9J1R0

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.