The last two years have seen a rapid change-over from mechanised cut and fill. stoping to the more economic and productive long hole open stoping method, such that today more than 80 per cent of total production is won from open stopes. At first drilling was by sub-level rings and/or parallel up and down holes from inter- mediate sill horizons using conventional exten- sion rod equipment. Sub-levels were developed no more than 40 metres apart to allow accurate drilling. Compact, crawler mounted in-the-hole hammer equipment was introduced as soon as it became available in Australia. Today, all open stope drilling is done with three Atlas Copco ROC306 rigs and two Ingersoll-Rand CMM jumbos._x000D_
Fans of 115 mm diameter holes, varying from near vertical down holes to horizontal, are drilled with a burden of 3 m. Toe spacing varies from 3.5 m to 4 m. An Atlas Copco DG418 booster compressor is used to boost run-of-mine air from 700 kPa to 1400 kPa in the areas of longest drilling._x000D_
This has improved overall drilling performance in these areas by 40 percent.
Return to parent product
  • Application Of In-The-Hole Hammer Drilling At The C. S. A. Mine, Cobar
    PDF
    This product is exclusive to Digital library subscription
  • Application Of In-The-Hole Hammer Drilling At The C. S. A. Mine, Cobar
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1976
  • PDF Size: 0.091 Mb.
  • Unique ID: P197703002

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.