Skip to main content
Conference Proceedings

Underground Operators' Conference, Mount Isa

Conference Proceedings

Underground Operators' Conference, Mount Isa

PDF Add to cart

Construction and Utilisation of the Olympic Dam Service Decline

The mining production rate of two million tonnes per annum at Olympic Dam required greater servicing capacity than was available with the existing Whenan Shaft. To increase servicing capability a Service Decline was constructed from June 1986 to June 1987 extending 2000 m from the surface and linking up with inclining development from the existing Whenan Shaft workings. The decline was used for access of all men and materials during the construction phase of the ore handling system. During production, most mine servicing will be via the decline with hoisting of rock through Whenan Shaft.
Return to parent product
  • Construction and Utilisation of the Olympic Dam Service Decline
    PDF
    This product is exclusive to Digital library subscription
  • Construction and Utilisation of the Olympic Dam Service Decline
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1987
  • PDF Size: 0.642 Mb.
  • Unique ID: P198804002

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.