Skip to main content
Conference Proceedings

Underground Operators' Conference, Mount Isa

Conference Proceedings

Underground Operators' Conference, Mount Isa

PDF Add to cart

Four Metre Diameter Raise Drilling at Olympic Dam Project S.A.

In the first half of 1987 two four metre diameter raise bore holes were drilled at the Olympic Dam Project for ventilation purposes. The first hole, 476 m x 4.0 m diameter was completed in 96 days, 35 days longer than scheduled. The second hole, 407 m x 4.0 m diameter was completed in 39 days, 2 days ahead of schedule. Both holes were drilled with a Robbins 121R rig using a Wirth head that consisted of 23 face cutters and 5 side cutters, supplied by a contractor. After the sites were located a grouting program was carried out to help seal off an aquifer between 160 and 180 m below the surface. Cavities discovered in the Andamooka Limestone were filled with concrete. Because of the overlying dune sands and clay both sites were pre-sunk to the competent Andamooka Limestone.
Return to parent product
  • Four Metre Diameter Raise Drilling at Olympic Dam Project S.A.
    PDF
    This product is exclusive to Digital library subscription
  • Four Metre Diameter Raise Drilling at Olympic Dam Project S.A.
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1987
  • PDF Size: 0.853 Mb.
  • Unique ID: P198804004

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.