Skip to main content
Conference Proceedings

Underground Operators' Conference, Mount Isa

Conference Proceedings

Underground Operators' Conference, Mount Isa

PDF Add to cart

Hilton - The All Electric Mine

Hilton Mine was first discovered in 1941. After a checkered history, plans were drawn up in 1983 to escalate development intensity to supplement Isa Mine's depleting lead-zinc reserves into the 1990's. The decision was made to make Hilton All Electric Mine' with 1000 V distribution._x000D_
Production of lead, zinc and silver commenced in June 1981 from the initial trial mining cut and fill block. One hundred thousand tonnes of sill development was completed by February 1988. The first sub level open stope (SLOS) block is scheduled for production in early 1989. The mine is targeted for 2.5 million tonnes/yr by 1996._x000D_
Various challenges have been met installing a 1000 V distribution, training mining and maintenance personnel on highly technical rigs, equipment selection and specifications, service contracts and equipment operation.
Return to parent product
  • Hilton - The All Electric Mine
    PDF
    This product is exclusive to Digital library subscription
  • Hilton - The All Electric Mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1987
  • PDF Size: 0.456 Mb.
  • Unique ID: P198804007

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.