Skip to main content
Conference Proceedings

Underground Operators' Conference, Mount Isa

Conference Proceedings

Underground Operators' Conference, Mount Isa

PDF Add to cart

Introduction of Trackless Haulage at Long Shaft Kambalda Nickel Operations

Long Shaft was initially developed using a rail haulage system on every working level comprising battery electric locomotives and granby trucks loaded by rail mounted rocker shovels. Production was commenced using conventional hand held cut and fill mining methods. In an effort to improve productivity and reduce operating costs a mechanised cut and fill stoping method evolved to suit the wider sections of the orebody. To further improve productivity and reduce costs the mechanised levels of the mine are progressively being redeveloped to enable the use of trackless diesel haulage equipment. An added benefit of trackless haulage equipment will be the ability to place development mullock into stopes as Fill.
Return to parent product
  • Introduction of Trackless Haulage at Long Shaft Kambalda Nickel Operations
    PDF
    This product is exclusive to Digital library subscription
  • Introduction of Trackless Haulage at Long Shaft Kambalda Nickel Operations
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1987
  • PDF Size: 0.541 Mb.
  • Unique ID: P198804008

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.