Six Metre Raisboring at Z.C. Mines
Production from a major, deep orebody requires the construction of two 6 m diameter, 1000 m deep ventilation shafts over the next three years. Further ventilation upgrades have foreshadowed an additional 1500 m of 6 m diameter shafts beyond that. After reviewing the construction alternatives it was decided to raisebore the first shaft in one pass using Western Mining Corporation's 121R raiseborer and the Wirth sequential head. The significant cost and speed of construction potential of 6 m raiseboring justified the risks associated with this new technology._x000D_
Large diameter sequential head raiseboring has only been carried out in South Africa._x000D_
Over the last three years many lessons have been learnt and the technology has progressed to being considered feasible._x000D_
Operating practice and the optimisation of raiseboring performance for specific ground conditions are the areas requiring further work. The development of large diameter raiseboring in South Africa and the site preparation and initial operation at Z.C. Mines are described. Comment on actual operating experience includes the geotechnical investigations, the raiseborer foundations, cuttings disposal and the drilling of the pilot hole which has progressed to beyond 450 m. Unforeseen difficulties with the verticality of the pilot hole and with mud losses illustrate the types of problems that can be expected.
Large diameter sequential head raiseboring has only been carried out in South Africa._x000D_
Over the last three years many lessons have been learnt and the technology has progressed to being considered feasible._x000D_
Operating practice and the optimisation of raiseboring performance for specific ground conditions are the areas requiring further work. The development of large diameter raiseboring in South Africa and the site preparation and initial operation at Z.C. Mines are described. Comment on actual operating experience includes the geotechnical investigations, the raiseborer foundations, cuttings disposal and the drilling of the pilot hole which has progressed to beyond 450 m. Unforeseen difficulties with the verticality of the pilot hole and with mud losses illustrate the types of problems that can be expected.
Contributor(s):
P W Hickson
-
Six Metre Raisboring at Z.C. MinesPDFThis product is exclusive to Digital library subscription
-
Six Metre Raisboring at Z.C. MinesPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1988
- PDF Size: 1.154 Mb.
- Unique ID: P198804016