Skip to main content
Conference Proceedings

Underground Operators' Conference, Mount Isa

Conference Proceedings

Underground Operators' Conference, Mount Isa

PDF Add to cart

The Development of No 2 Ore Shaft as a Surface Hoisting Shaft at Mount Isa Mines Limited

"During the latter part of 1936, conditions encountered in sinking the Main Ore shaft made it impractical and uneconomical to continue deepening it to serve haulage levels below the present No. 5 level. Plans were therefore made for an interior shaft, to serve new lower levels, that terminated above No. 5 level so that ore hoisted could be drawn off on this level and transported to the Main Ore shaft for final conveyance to the mill crude ore bin". The No. 2 interior ore shaft was only developed below No. 4 level and borehole ropeways with a winder located on the surface were installed in preference to an underground winder installation. No. 2 ore shaft with borehole ropeways commenced lead ore hoisting operations in September 1938. Apart from the copper ore hoisted in the war years of 1943-46, lead ore was hoisted to No. 5 level until September, 1951.
Return to parent product
  • The Development of No 2 Ore Shaft as a Surface Hoisting Shaft at Mount Isa Mines Limited
    PDF
    This product is exclusive to Digital library subscription
  • The Development of No 2 Ore Shaft as a Surface Hoisting Shaft at Mount Isa Mines Limited
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1987
  • PDF Size: 0.495 Mb.
  • Unique ID: P198804019

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.