Skip to main content
Conference Proceedings

Underground Operators' Conference, Mount Isa

Conference Proceedings

Underground Operators' Conference, Mount Isa

PDF Add to cart

The Underground Ore Handling System at Olympic Dam Project, South Australia

With production at Olympic Dam scheduled to commence in June 1988, it has been necessary to install a complete underground ore handling system capable of removing two million tonnes of material annually from the mine. The system comprises mucking from stope drawpoints, truck haulage to underground storage, primary crushing, conveying and hoisting. On the surface, material is conveyed to stockpiles at the Metallurgical Plant. Mining of the numerous special excavations within the system was incorporated into the mine's ongoing development program prior to the underground construction phase. Utilisation of a decline from the surface enabled versatile construction equipment to operate at the underground sites as well as simplifying the transportation and delivery of construction Materials.
Return to parent product
  • The Underground Ore Handling System at Olympic Dam Project, South Australia
    PDF
    This product is exclusive to Digital library subscription
  • The Underground Ore Handling System at Olympic Dam Project, South Australia
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1987
  • PDF Size: 0.459 Mb.
  • Unique ID: P198804022

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.