The Upgrade of the Ore Haulage Facilities at Z.C. Mines, Broken Hill

A Feasibility Study to determine the future of ZC Mines was completed in mid 1987. Early in this study, which lasted two years, it was identified that significant reductions in treatment costs would result if the Zinc Corporation Concentrator was closed. All of the production from the existing two mines, The Zinc Corporation Limited (ZC) and New Broken Hill Consolidated Limited (NBHC), would then be treated in the concentrator at NBHC.After a partial upgrade of the NBHC concentrator, the ZC concentrator was finally closed and all of the equipment disposed of._x000D_
This closure highlighted the need to concentrate all ore haulage in one shaft to further reduce operating costs and remove the cost of surface transport of ZC production to the improved NBHC concentrator._x000D_
This paper outlines the changes that were made to improve the haulage system for ZC Mines._x000D_
After a number of options were investigated, it was finally decided that the upgrade of the existing NBHC haulage shaft was the best option even though some production would be lost while the upgrade was in progress.
Return to parent product
  • The Upgrade of the Ore Haulage Facilities at Z.C. Mines, Broken Hill
    PDF
    This product is exclusive to Digital library subscription
  • The Upgrade of the Ore Haulage Facilities at Z.C. Mines, Broken Hill
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1987
  • PDF Size: 0.58 Mb.
  • Unique ID: P198804023

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.