Skip to main content
Conference Proceedings

Underground Operators Conference Proceeding 2025

Conference Proceedings

Underground Operators Conference Proceeding 2025

PDF Add to cart

Probabilistic development rates – using data and stochastic modelling to integrate contingency

Oyu Tolgoi is a block caving mine located in the South Gobi province of Mongolia. In July 2022, underground production commenced and as of December 2022, approximately 101 km of lateral development has been completed and a further 118 km is required to support the greater Hugo North Lift 1 orebody. Historically, life-of-mine scheduling for underground development has been driven by a calibrated first principles build-up for lateral development tasks, where consumable use and equipment performance parameters were used to calculate a task rate and generate deterministic schedule outputs. Contingency was then determined via a risk-ranging process and applied as an additional duration following finalisation of the schedule. A project was initiated with the primary purpose to enable fit for purpose scheduling rates at each planning horizon. It also aimed to integrate contingency within the schedule. The project specifically focused on lateral development task rates and utilised historical cycle time data to plot a cumulative probability distribution for each lateral development rate, defined by ‘schedule profiles’, from which a specific confidence could be drawn. Application of this method also allowed for schedule simplification, reducing the number of schedule profiles from over 450 to 30 in total. The methodology was initially validated via a proof-of-concept application to a feasibility study schedule before handover to site for implementation within the mine budget scheduling process. The project was able to successfully leverage data analysis to enable a risk-adjusted scheduling process and simplify creation of development task rates across planning horizons.
Return to parent product
  • Probabilistic development rates – using data and stochastic modelling to integrate contingency
    PDF
    This product is exclusive to Digital library subscription
  • Probabilistic development rates – using data and stochastic modelling to integrate contingency
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2025
  • Unique ID: P-04937-G9Z2Y3

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.