Conference Proceedings
Underground Operators' Conference, West Coast Tasmania
Conference Proceedings
Underground Operators' Conference, West Coast Tasmania
Introduction of Electric L.H.D.'s at Rosebery Engineering Aspects
Production implications of the introduct- ion of electric L.H.D. units in sublevel open stoping and pillar recovery at Rosebery are covered by Faulkner (1982) and Carlton (1982). The following engineering aspects associated with the decision to introduce electric L.H.D.'s are considered here: - Initial requirements for commissioning, including power reticulation at an adequate level to all operating areas. - Conversion of a manual system to radio remote control. - Maintenance backup requirement to ensure that the production potential is realised.
Contributor(s):
J T Laugher
-
Introduction of Electric L.H.D.'s at Rosebery Engineering AspectsPDFThis product is exclusive to Digital library subscription
-
Introduction of Electric L.H.D.'s at Rosebery Engineering AspectsPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1982
- PDF Size: 1.169 Mb.
- Unique ID: P198203008