Skip to main content
Conference Proceedings

Underground Operators' Conference, West Coast Tasmania

Conference Proceedings

Underground Operators' Conference, West Coast Tasmania

PDF Add to cart

Introduction of Electric L.H.D.'s at Rosebery Engineering Aspects

Production implications of the introduct- ion of electric L.H.D. units in sublevel open stoping and pillar recovery at Rosebery are covered by Faulkner (1982) and Carlton (1982). The following engineering aspects associated with the decision to introduce electric L.H.D.'s are considered here: - Initial requirements for commissioning, including power reticulation at an adequate level to all operating areas. - Conversion of a manual system to radio remote control. - Maintenance backup requirement to ensure that the production potential is realised.
Return to parent product
  • Introduction of Electric L.H.D.'s at Rosebery Engineering Aspects
    PDF
    This product is exclusive to Digital library subscription
  • Introduction of Electric L.H.D.'s at Rosebery Engineering Aspects
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1982
  • PDF Size: 1.169 Mb.
  • Unique ID: P198203008

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.