Planning and Designing Cavities for Underground Power House in Himalayas

Himalayan ranges on the northern border of India are source of many perennial rivers and suitable sites for large dams have been located therein. However, Himalayas are young mountains and comprise of comparatively weaker rocks having adverse geological features like shear seams, thrust zones, minor and major faults and intense jointing. Tehri dam project under construction, is located in lower Himalayas._x000D_
It envisages construction of a 260.5 m high earth and rock fill dam and an underground power station of 2000 MW (Eight machines of 250 MW each, four of which will be reversible) installed capacity. This dam will be the highest and the underground complex will be the largest to be constructed in India in the Himalayas. The under- ground complex comprises of 25 km of tunnels varying in diameter from 6 m to 11 m and seven large cavities of various sizes, the biggest being 22 m in width, 194 m in length and 65 m in height._x000D_
Rock formation in the power house complex belong to phyllites having various joint sets spaced from 0.5 m to 3 m. Due to the poor geological conditions and closely spaced net work of large cavities, the planning, analysis and design of the cavities is a challenging job. Many aspects have to be considered in determining the sizes, locations and orientations of the various cavities taking into account the properties and jointing pattern of rock mass, functional requirements and economics. Correct evaluation of loads and forces is necessary for economical design of supporting system for the various cavities. Rock loads on the roof of cavities and their supporting system will be assessed with the help of the latest methods. The stability of the rock mass around the cavity will be evaluated by elasto- plastic method using finite or boundary element techniques. A scheme of field investigations, laboratory tests and instrumentation for deter- mining rock properties in preconstruction stage and for monitoring behaviour of the underground cavities during and after construction is envisaged.
Return to parent product
  • Planning and Designing Cavities for Underground Power House in Himalayas
    PDF
    This product is exclusive to Digital library subscription
  • Planning and Designing Cavities for Underground Power House in Himalayas
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1986
  • PDF Size: 0.818 Mb.
  • Unique ID: P198701040

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.