Skip to main content
Conference Proceedings

Vl Australian Tunnelling Conference: Bore or Blast, Melbourne

Conference Proceedings

Vl Australian Tunnelling Conference: Bore or Blast, Melbourne

PDF Add to cart

Some Consideration on Tunnel Excavation Methods in Mudstone Strata

The double track railway tunnel, called the Second Shirasaka Tunnel is being constructed under the supervision of Japanese PTational Rail- ways (JNR) in the tertiary soft rock strata in order to speed up the railway transportation. This tunnel (L=1765m), located in a central part of Japan, is excavated by the machine (roadheader), while the adjoining First Shirasaka Tunnel (L=1296m), completed five years ago, was driven by the blasting, and NATM is adopted in both tunnels. The geological features in this region are Neogene Tertiary of Miocene sediments consisted of mudstone, the sandy mudstone and the alter- ation of these rocks, having a squeezing be- haviour. And the geological structure is as complicated as some anticline and syncline structures, large or small scale exist, and as a lot of faults are found. The machine excavation manner using road- header is adopted in this tunnel to minimize the effect of excavation because there is a possibility of the occurrence of landslide due to the tunnel excavation, and also because local inhabitants reside on the ground surface.
Return to parent product
  • Some Consideration on Tunnel Excavation Methods in Mudstone Strata
    PDF
    This product is exclusive to Digital library subscription
  • Some Consideration on Tunnel Excavation Methods in Mudstone Strata
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1986
  • PDF Size: 0.648 Mb.
  • Unique ID: P198701051

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.