Skip to main content
Conference Proceedings

World Gold 2019

Conference Proceedings

World Gold 2019

PDF Add to cart

Plant optimisation approach at the Tropicana Gold Mine

AngloGold Ashanti Ltds Operational Excellence initiative has seen an ongoing focus on margin improvements through a range of projects to deliver productivity and cost improvements at all of its operations. In processing this meant matching processing plant capability to mining output and maximising plant utilisation and throughput without increasing operating costs. At the Tropicana Gold Mine (AngloGold Ashanti Australia Ltd 70% and manager, Independence Group NL 30%), in Western Australia, considerable emphasis was placed on optimisation of the process circuit using operational data from the processing plant. Traditionally these optimisation exercises had been executed internally by the operations team but in an attempt to improve design and cost outcomes, a collaborative approach was selected, in which external consultants worked closely with the operations team. The purpose of this paper is to explain the approach that was adopted by the engineering company and the owner to optimise the process circuit and achieve an associated increase in throughput whilst decreasing the operating cost at the Tropicana Gold Mine, namely: optimising the conveyor system to minimise shutdown duration and increase the conveyor design capacity; optimising the design to increase equipment life and reduce scheduled shutdown duration; optimising the leaching circuit; and managing the tailing cyanide discharge levels through water management and dilution. The authors will discuss the various decisions made during the optimisation process and will show that adopting alternate design decisions can have a major positive cost impact. Effective interpretation and understanding of the overarching issues, combined with good collaboration (one joint team including client operational personnel and design consultants), zero base design and effective use of appropriate equipment are some of the factors that can be used to deliver an optimal final outcome. Very good results were achieved at Tropicana, demonstrating the effectiveness of this approach.
CITATION:Ngo, H, Rjeily, N A and Piscicelli, S, 2019. Plant optimisation approach at the Tropicana Gold Mine, in Proceedings World Gold 2019, pp 224234 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Plant optimisation approach at the Tropicana Gold Mine
    PDF
    This product is exclusive to Digital library subscription
  • Plant optimisation approach at the Tropicana Gold Mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2018
  • PDF Size: 1.144 Mb.
  • Unique ID: p201906026

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.