Conference Proceedings
                        World Gold 2019
Conference Proceedings
                            World Gold 2019
The Auplata modular gold recovery plant
                            
The Auplata modular gold plant project entails establishing a processing facility for the recovery of gold from tailings produced by historical mining activity in French Guiana, and forms a key component of Auplatas strategy of deploying lixiviation plants to develop the gold industry in the region. The historic tailings were the result of earlier workings, employing treatment via gravity separation processes only, and hence contain significant quantities of unrecovered gold. The selected site, in the North-eastern region of South America, is surrounded by tropical forests and can be accessed by light aircraft or via road after crossing the lake by barge. The process plant is specifically designed for easy installation at a remote site, and allows scope for future expansion, by using a pre-fabricated modular approach. The circuit includes screening, thickening, carbon in leach (CIL), carbon recovery and cyanide detox, including all ancillaries and utilities, with a provision for the future inclusion of a grinding circuit, elution plant and gold room. Metallurgical test work, circuit modelling, feasibility studies, plant design and construction supervision were all conducted by SGS Bateman on behalf of Auplata. SGS Bateman cold commissioned the gold plant and was responsible for the supervision of the operations for cold commissioning period. This paper describes the key features of the process development and construction philosophy applied to this distinctive project. The selection of the final processing circuit, the practical considerations taking both capital expenditure and ease of operation is also described in this paper.
CITATION:Auerswald, D, Van Niekerk, N, Hutamo, C and Moses, S, 2019. The Auplata modular gold recovery plant, in Proceedings World Gold 2019, pp 520526 (The Australasian Institute of Mining and Metallurgy: Melbourne).
                    
                        CITATION:Auerswald, D, Van Niekerk, N, Hutamo, C and Moses, S, 2019. The Auplata modular gold recovery plant, in Proceedings World Gold 2019, pp 520526 (The Australasian Institute of Mining and Metallurgy: Melbourne).
                                    
                                        Contributor(s):
                                    
                                    D Auerswald, N Van Niekerk, C Hutamo, S Moses
                                
                            - 
                                                            SubscribeThe Auplata modular gold recovery plantPDFThis product is exclusive to Digital library subscription
- 
                                                            Add to cartThe Auplata modular gold recovery plantPDFNormal price $22.00Member price from $0.00Fees above are GST inclusive 
                                        
                                        PD Hours
                                    
                                    
                                        
                                            Approved activity
                                        
                                    
                                - Published: 2019
- PDF Size: 1.531 Mb.
- Unique ID: p201906048
