Skip to main content
Conference Proceedings

World Gold '91, Cairns Qld, April 1991

Conference Proceedings

World Gold '91, Cairns Qld, April 1991

PDF Add to cart

Integral Pressure Stripping

The recent re-emergence of an Integral Pressure Stripping system which operates with both cell and column in closed circuit at elevated temperature and pressure, requires no cyanide in the eluate solution and has greatly reduced carbon reactivation requirements in seen as a progressive step in this area. Several of these re-configured IPS systems have been placed in service in Australia and overseas in the last three years, with the first of the new generation units constructed and commissioned by Como Engineers Pty._x000D_
Ltd. at Mt. Fisher in the East Murchison of W.A. in September 1987. This plant was relocated to a new ore body at Darlot W.A. in February 1989. Use is made of a data base of raw plant performance figures from both Mr. Fisher and Darlot and its performance compared with other operating plants. Initial commissioning difficulties of the Mt. Fisher prototype and dis- cussed together with the modifications and operational procedures required to overcome these problems. Stripping times of less than 6 hours at 145 degrees have been achieved with barren carbon values less than l O ppm from loaded carbon values above 3000 ppm and with cell pass efficiencies reaching 90 per cent.
Return to parent product
  • Integral Pressure Stripping
    PDF
    This product is exclusive to Digital library subscription
  • Integral Pressure Stripping
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1990
  • PDF Size: 0.939 Mb.
  • Unique ID: P199102030

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.