Gateroad Development - The Correct Method, the Correct Equipment?
Longwall mining in Australia is approaching maturity. Longwall production from 'state of the art' Australian longwall
mines now rivals similar US based longwall operations. Regrettably however, Australian gate road development rates in
general fall short of the required development to longwall production ratios that are required to sustain annual longwall
production capabilities. By contrast, most US based longwall mines achieve the required development to longwall
production ratios to sustain their longwalls. This is despite many having to drive three heading longwall panel gate
headings to meet regulatory requirements.
mines now rivals similar US based longwall operations. Regrettably however, Australian gate road development rates in
general fall short of the required development to longwall production ratios that are required to sustain annual longwall
production capabilities. By contrast, most US based longwall mines achieve the required development to longwall
production ratios to sustain their longwalls. This is despite many having to drive three heading longwall panel gate
headings to meet regulatory requirements.
Contributor(s):
N Gow
-
Gateroad Development - The Correct Method, the Correct Equipment?PDFThis product is exclusive to Digital library subscription
-
Gateroad Development - The Correct Method, the Correct Equipment?PDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1998
- PDF Size: 1.314 Mb.
- Unique ID: P199806029